Customization: | Available |
---|---|
After-sales Service: | 1 Year |
Application: | Customize |
Still deciding? Get samples of US$ 1499/Set
Order Sample
|
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
|
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
The Multifunctional creative container can be used as a commercial home such as cafes/shop/restaurtant etc. which can attract the attention of consumers, it can be customized according to the different needs of the customer, its unique creative appearance can attract guests, it can also be used for creative B&B, and the style that matches the scenery, different from the modern steel and concrete structure, Multifunctional creative containers are beautiful in shape, safe and comfortable, easy to disassemble and transport.
Warranty | 1year |
Terms Of Payment | 30% deposit, 70% before shipping |
Service | Video technology, Online and Site Support |
Delivery time | According to the quantity and type of products, we will delivery within 3 days to 1 month after receipt of payment. |
Place Of Origin | Weifang, China |
Transport Package | Wooden Frame or Sandwich Panels Protection and Film Wrapped |
Material | Steel structure |
Customization | Available |
Size(MM) | 6058(L)*2438(W)*2896(H) or customized |
Total Area | 23.71 Square Meters |
Wood Material | Pine, Burmese teak, elm, birch, oak, cedar wood or customized |
Roof Material | Color steel tile,Resin tile,waterproof roll |
Wood Treatment | Drying, liposuction, antiseptic, pest control |
Window material | Aluminum alloy |
Certification | CE,ISO |
Installation | As Drawing |
Life Span | 10-20years |
Trademark | Zone Tang |
Structure | Galvanized Steel Frame |
Designs and Drawings | Customized |
Port | Qingdao or Tianjian |
roof structure |
galvanized steel structure with 4 corner pieces |
1) 0.4/0.5mm Galvanized steel roof covering | |
2)material insulation(EPS, rock wool ,PU, graphene etc.) | |
3) galvanized steel plate | |
base structure |
galvanized steel structure with 4 corner pieces |
1) 1/1.5/1.8/2 mm plastic flooring or floor leather or laminated wood floor or patterned aluminum sheet | |
2) 15/18/20MM calcium silicate board, fiber cement board or MGO board | |
3)galvanized steel plate | |
Columns | galvanized steel structure(or hot galvanized) |
Color | Multi-color & Customized |
Wall | 50/75/100mm sandwich board, standard steel double-sided 0.35mm(sandwich materical is EPS, rock wool ,PU, graphene etc.) standard sandwich materialis is no less than 80kg/m3 |
Window | Broken bridge aluminum, aluminium alloy frame, Color steel sliding window or Customized |
Door | Steel security door , Plastic-steel door, Aluminum door, Fireproof door, KFC door or Customized |
Electricity | Match local standard & other country electrical standards, wire essential; Other electrical supplies are optional and quoted separately ( available distribution box, lights, switch, sockets, air conditioning socket or customized) |
Application | Café house, carport, hotel, house, office, sentry box, guard house, shop,toilet,villa,warehouse,workshop, dormitory, camp, bathroom, changing room, school, classroom, library, booth, meeting room, canteen, living house etc, |
Painting | Automatic galvanizing and baking paint spray molding |
Temperature resistant | -40ºC-50ºC |
Service | Video technology, Online and Site Support |
Wind Resistance | Grade 12 |
Earthquake Resistance | Grade 8 |
optional accessories |
Furniture, kitchen , bathroom, shower, Ceiling, decorative materials, etc. |
Advantage | 1)fast installation: save labor cost; 2)Anti-rust:all material use galvanized steel 3)waterproof: steel ceiling,wall,floor 4)fireproof:Fire rating A grade |
Service support |
1)Make design for clients 2)Provide pictures and production schedule for clients every 3 days 3)provide packing list and installation instruction for clients before shipping 4)Offer sent installation engineer to clients site for installation instruction |
1)Fast installation:5hours/set/person,save labor cost;
2)Anti-rust:all materiel can use galvanized steel
3)waterproof: steel ceiling,wall,floor
4)fireproof:Fire rating A grade
1)Make design for clients
2)Provide pictures and production schedule for clients every 3 days
3)provide packing list and installation instruction for clients before shipping
4)Can sent installation engineer to clients site for installation instruction
Zone Tang Steel Structure Limited is a specialized enterprise dedicated to the research and development, production, and sales of high-quality steel structures, mobile home and container engineering construction.
Our company is located in Weifang City, known as the kite capital of the world, with convenient transportation due to its ocean shipping. we have 16 years professional experience, and our plant spanning across 10,000 square meters.
Our products including flat pack house, expandable container house, folding container house, modified shipping container house, functional container house, prefab house, mobile house, prefab villa, space capsule house etc...All are made of prefabricated steel structures, and each product can be customized according to customer's needs.
"Quality from Professionalism,Professionalism creates Quality",Zone Tang has always adhered to the five basic principles of " first-class technology, first-class quality, first-class speed, first-class management and first-class service," aiming to provide high-quality projects for domestic and foreign customers while also showcasing Chinese manufacturing power and aesthetics to global friends.
1: Are you the factory or the trading company?
A: We are Manufacturer/Factory & Trading Company. Please visit us, and we can give you the affordable price.
2: What's your MOQ?
A:Our MOQ is 1 set. Any small trial order is also welcomed and can be in a further discussion.
3: How Long does it take to build a light steel prefab house?
A: It depends on the size of the house. Generally, one 50 square meter house five workers 1-3 days finished installation, save manpower and time
4. Q: How about your date of manufacture?
A:Generally according to the different products, the production date is different.
5.How can we make sure about the product quality after we put the order?
A: Before delivery, we will send you the pictures and videos for you to check the quality, and also you can arrange for quality checking by yourself or by your contacts in the third party inspection organization.
6: How many days needed to install the house?
For prefab camp house: 6 experienced workers 100sqm per day.
For 20ft flat pack container house: 4 workers 4 units per day.
For 20ft cost-effective container house: 4-6 workers 1 unit per day.
For single storey prefab villa(100m): 4-6 workers finished all installing in 1-2 week.
For light steel structure villa: 6-8 workers finished about 40sqm within 8-10 days
Above that it is conventional advice, Final result will base on the efficiency of local staff.
7: What certificate do you have?
A: We have been awarded the certificate by CE, American building Code, ISO9001, ISO14001.
8: What kind of technical drawings could you provide?
A: We could provide three-view drawing, 3D picture, blueprint, foundation, plumbing, electrical, communication, fire alarm, installation, furniture and so on.
9: What is the lifespan and warranty period?
A: The lifespan for Prefab house is 5 to 10year, Container house is 10-15years, Steel structure is 15-20years and Villa is 20-50years. The warranty period for all the house is 12months from the delivery.
10: What the value added service do you have?
A: We have camp/community planning design, indoor and outdoor electrical/plumbing design, communication/fire alarm/security system supply, furniture/ electric appliance offer, etc.
11: How Is your after-sales service?
1. Any question, welcome to contact us. 24 hours available for you.
2. One order, one special person to follow the whole process.
3. For the house installation, we will give you the installation drawing and installation manual. If you need, we also can send you an engineer to teach your workers, but you need to charge the double ticket, accommodation, food and salary.