Customization: | Available |
---|---|
After-sales Service: | 1 |
Feature: | Durable, Easy to Assemble, Movable, Customize |
Still deciding? Get samples of US$ 1150/Set
Request Sample
|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
As an innovative work of modern construction technology, prefabricated office buildings are leading the new trend of office space with their high efficiency, flexibility and environmental protection. Through factory prefabrication and on-site assembly, the construction period is greatly shortened and quick occupancy is achieved.
The high-quality steel structure material is used, and the design is diverse. The appearance, structure and internal layout can be customized according to customer needs to meet the office needs of various enterprises. The modular design makes the space easy to expand and adjust to adapt to the future development of the enterprise.
Prefabricated office buildings pay attention to environmental protection during the production process, and the materials can be recycled, reducing construction waste and meeting green building standards. At the same time, its excellent thermal insulation and sound insulation performance creates a comfortable and healthy office environment for employees.
In short, prefabricated office buildings have become the preferred choice of modern enterprises with their advantages of high efficiency, flexibility and environmental protection, helping enterprises to quickly build ideal office spaces, enhance corporate image and promote sustainable development.
Certification | CE, ISO |
Color | Customized |
Life Span | 10-20years |
Trademark | Zone Tang |
Transport Package | Wooden Frame or Sandwich Panels Protection and Film Wrapped |
Structure | Galvanized Steel Frame |
Designs and Drawings | Customized |
Origin | Weifang, China |
Temperature resistant | -40ºC-50ºC |
Wind Resistance | Grade 12 |
Earthquake Resistance | Grade 8 |
Service | Video technology, Online and Site Support |
Warranty | 1 year |
Weight | 1.2-1.8t |
Roof Structure |
galvanized steel structure with 4 corner pieces |
1) 0.4/0.5mm Galvanized steel roof covering | |
2)material insulation(EPS, rock wool ,PU, graphene etc.) | |
3) galvanized steel plate | |
Base Structure |
galvanized steel structure with 4 corner pieces |
1) 1/1.5/1.8/2 mm plastic flooring or floor leather or laminated wood floor or patterned aluminum sheet | |
2) 15/18/20MM calcium silicate board, fiber cement board or MGO board | |
3)galvanized steel plate | |
Columns | 3mm galvanized steel structure(or hot galvanized) 3mm |
Wall | 50/75/100mm sandwich board, standard steel double-sided 0.35mm(sandwich materical is EPS, rock wool ,PU,graphene etc.) standard sandwich materialis is no less than 80kg/m3 |
Door | Steel security door , Plastic-steel door, Aluminum door, Fireproof door, KFC door or Customized,, |
Window | Broken bridge aluminum, aluminium alloy frame, Color steel sliding window or Customized ,, |
Unit |
1.the column's internal corner covering 2.Use for fixing the column's internal corner covering 3.undivided rooms' column covering 4.Use for fixing undivided rooms' column covering 5.undivided rooms' roof beam covering 6.Galvanized steel covering 7.Galvanized floor connectors |
Electricity | Match local standard & other country electrical standards, wire essential; Other electrical supplies are optional and quoted separately ( 1 available distribution box, 2lights, 1switch, 4sockets,1 air conditioning socket or customized) |
Optional Accessories | Furniture,electrical appliance for accommodation, kitchen ,bathroom,shower, ceiling,decorative materials,etc. |
Application | office,toilet,bathroom,changing room,school,classroom,library,shop, meeting room,canteen,guard house,temporary project department of engineering, temporary dormitory for students, temporary makeshift hospital, portable RV, snack street, booth,kiosk, dining car, camp dormitory, camp hotel, playground castle, children's entertainment fortress, recreational villa in tourist area, resort area, earthquake relief materials, post-war reconstruction materials, field office,etc, |
1)Fast installation:5hours/set/person,save labor cost;
2)Anti-rust:all materiel can use galvanized steel
3)waterproof: steel ceiling,wall,floor
4)fireproof:Fire rating A grade
1)Make design for clients
2)Provide pictures and production schedule for clients every 3 days
3)provide packing list and installation instruction for clients before shipping
4)Can sent installation engineer to clients site for installation instruction
Zone Tang Steel Structure Limited is a specialized enterprise dedicated to the research and development, production, and sales of high-quality steel structures, mobile home and container engineering construction.
Our company is located in Weifang City, known as the kite capital of the world, with convenient transportation due to its ocean shipping. we have 16 years professional experience, and our plant spanning across 10,000 square meters.
Our products including flat pack house, expandable container house, folding container house, modified shipping container house, functional container house, prefab house, mobile house, prefab villa, space capsule house etc...All are made of prefabricated steel structures, and each product can be customized according to customer's needs.
"Quality from Professionalism,Professionalism creates Quality",Zone Tang has always adhered to the five basic principles of " first-class technology, first-class quality, first-class speed, first-class management and first-class service," aiming to provide high-quality projects for domestic and foreign customers while also showcasing Chinese manufacturing power and aesthetics to global friends.
1: Are you the factory or the trading company?
A: We are Manufacturer/Factory & Trading Company. Please visit us, and we can give you the affordable price.
2: What's your MOQ?
A:Our MOQ is 1 set. Any small trial order is also welcomed and can be in a further discussion.
3: How Long does it take to build a light steel prefab house?
A: It depends on the size of the house. Generally, one 50 square meter house five workers 1-3 days finished installation, save manpower and time
4. Q: How about your date of manufacture?
A:Generally according to the different products, the production date is different.
5.How can we make sure about the product quality after we put the order?
A: Before delivery, we will send you the pictures and videos for you to check the quality, and also you can arrange for quality checking by yourself or by your contacts in the third party inspection organization.
6: How many days needed to install the house?
For prefab camp house: 6 experienced workers 100sqm per day.
For 20ft flat pack container house: 4 workers 4 units per day.
For 20ft cost-effective container house: 4-6 workers 1 unit per day.
For single storey prefab villa(100m): 4-6 workers finished all installing in 1-2 week.
For light steel structure villa: 6-8 workers finished about 40sqm within 8-10 days
Above that it is conventional advice, Final result will base on the efficiency of local staff.
7: What certificate do you have?
A: We have been awarded the certificate by CE, American building Code, ISO9001, ISO14001.
8: What kind of technical drawings could you provide?
A: We could provide three-view drawing, 3D picture, blueprint, foundation, plumbing, electrical, communication, fire alarm, installation, furniture and so on.
9: What is the lifespan and warranty period?
A: The lifespan for Prefab house is 5 to 10year, Container house is 10-15years, Steel structure is 15-20years and Villa is 20-50years. The warranty period for all the house is 12months from the delivery.
10: What the value added service do you have?
A: We have camp/community planning design, indoor and outdoor electrical/plumbing design, communication/fire alarm/security system supply, furniture/ electric appliance offer, etc.
11: How Is your after-sales service?
1. Any question, welcome to contact us. 24 hours available for you.
2. One order, one special person to follow the whole process.
3. For the house installation, we will give you the installation drawing and installation manual. If you need, we also can send you an engineer to teach your workers, but you need to charge the double ticket, accommodation, food and salary.