Customization: | Available |
---|---|
After-sales Service: | 1 Year |
Application: | Customize |
Still deciding? Get samples of US$ 1200/Ton
Order Sample
|
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
|
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
The Prefab house, also called Prefabricated House, Prefab House, Prefabricated House, Prefabricated Building, Prefabricated Dormitory, Prefabricated Modular House. These houses are designed & manufactured with steel structure frames & sandwich panels, assembled with doors, and windows. Its main feature is that the support structure can use the strength on both sides of the board to build a building support system. In addition, the Prefab K house usually uses steel or aluminum alloy materials, which have relatively high stability and earthquake resistance, and are more durable. Prefab K houses can also be disassembled and moved according to different needs, and are suitable for short-term use or places that often need to change locations, such as temporary residences, warehouses, construction site housing, etc.
Certification | CE, ISO |
Color | Customized |
Installation | As Drawing |
Life Span | 10-15years |
Trademark | Zone Tang |
Production Capacity | 200 Sets/ Month |
Transport Package | Disassembling for loading and unloading |
Structure | Galvanized Steel Frame |
Designs and Drawings | Customized |
Origin | Weifang, China |
Temperature resistant | -40ºC-50ºC |
Service | Video technology, Online and Site Support |
Warranty | 1 year |
Wind Resistance | Grade 12 |
Earthquake Resistance | Grade 8 |
Storey | One/Two/Three |
Material | Steel, Aluminum alloy frame, and EPS Sandwich Panel |
roof structure |
Frame: cold formed and welded finish |
1) 0.5mm thick colored steel cover sheet | |
2)material insulation(rock wool, EPS,PU, graphene etc.) | |
3) PE frame+plaster casting(optional) | |
Floor | concrete floor and tiles or wood floor(tiles and wood floor separate quotation) |
Columns | galvanized steel structure |
wall | 50/75/100mm sandwich board, standard steel double-sided 0.35mm(sandwich materical is rock wool , EPS, PU,graphene etc.) standard sandwich materialis is no less than 80kg/m3 |
Window | UPVC sliding window,Broken bridge aluminum, aluminium alloy frame, Color steel sliding window or Customized +fly screen+burglar bar; |
Door | Steel security door , Plastic-steel door,, Aluminum door, Fireproof door, KFC door or Customized |
accessories |
Screw Blot, Nail, Steel bending Trims |
Paint | Galvanized treatment + base painting + surface painting |
color: white gray, red, blue or Customized | |
Corner Posts | Cold bending profiles;Downpipe(Separate installation and separate quotation) |
Application | office,dormitory,camp,toilet,bathroom,changing room,school,classroom,meeting room,canteen, guard house, living house etc, |
Advantage | 1)Simple foundation:just need 6pcs concrete block foundation for 20ft; 2)Anti-rust:all material use galvanized steel 3)waterproof: steel ceiling,wall,floor 4)fireproof:Fire rating A grade |
Service support |
1)Make design for clients 2)Provide pictures and production schedule for clients every 3 days 3)provide packing list and installation instruction for clients before shipping 4)Offer sent installation engineer to clients site for installation instruction |
Price terms | FOB,CFR,CIF |
Delivery time | According to the quantity and type of products, we will delivery within 3 days to 1 month after receipt of payment. |
Terms of Payment | TT; L/C |
1)Make design for clients
2)Provide pictures and production schedule for clients every 3 days
3)provide packing list and installation instruction for clients before shipping
4)Can sent installation engineer to clients site for installation instruction
Zone Tang Steel Structure Limited is a specialized enterprise dedicated to the research and development, production, and sales of high-quality steel structures, mobile home and container engineering construction.
Our company is located in Weifang City, known as the kite capital of the world, with convenient transportation due to its ocean shipping. we have 16 years professional experience, and our plant spanning across 10,000 square meters.
Our products including flat pack house, expandable container house, folding container house, modified shipping container house, functional container house, prefab house, mobile house, prefab villa, space capsule house etc...All are made of prefabricated steel structures, and each product can be customized according to customer's needs.
"Quality from Professionalism,Professionalism creates Quality",Zone Tang has always adhered to the five basic principles of " first-class technology, first-class quality, first-class speed, first-class management and first-class service," aiming to provide high-quality projects for domestic and foreign customers while also showcasing Chinese manufacturing power and aesthetics to global friends.
1: Are you the factory or the trading company?
A: We are Manufacturer/Factory & Trading Company. Please visit us, and we can give you the affordable price.
2: What's your MOQ?
A:Our MOQ is 1 set. Any small trial order is also welcomed and can be in a further discussion.
3: How Long does it take to build a light steel prefab house?
A: It depends on the size of the house. Generally, one 50 square meter house five workers 1-3 days finished installation, save manpower and time
4. Q: How about your date of manufacture?
A:Generally according to the different products, the production date is different.
5.How can we make sure about the product quality after we put the order?
A: Before delivery, we will send you the pictures and videos for you to check the quality, and also you can arrange for quality checking by yourself or by your contacts in the third party inspection organization.
6: How many days needed to install the house?
For prefab camp house: 6 experienced workers 100sqm per day.
For 20ft flat pack container house: 4 workers 4 units per day.
For 20ft cost-effective container house: 4-6 workers 1 unit per day.
For single storey prefab villa(100m): 4-6 workers finished all installing in 1-2 week.
For light steel structure villa: 6-8 workers finished about 40sqm within 8-10 days
Above that it is conventional advice, Final result will base on the efficiency of local staff.
7: What certificate do you have?
A: We have been awarded the certificate by CE, American building Code, ISO9001, ISO14001.
8: What kind of technical drawings could you provide?
A: We could provide three-view drawing, 3D picture, blueprint, foundation, plumbing, electrical, communication, fire alarm, installation, furniture and so on.
9: What is the lifespan and warranty period?
A: The lifespan for Prefab house is 5 to 10year, Container house is 10-15years, Steel structure is 15-20years and Villa is 20-50years. The warranty period for all the house is 12months from the delivery.
10: What the value added service do you have?
A: We have camp/community planning design, indoor and outdoor electrical/plumbing design, communication/fire alarm/security system supply, furniture/ electric appliance offer, etc.
11: How Is your after-sales service?
1. Any question, welcome to contact us. 24 hours available for you.
2. One order, one special person to follow the whole process.
3. For the house installation, we will give you the installation drawing and installation manual. If you need, we also can send you an engineer to teach your workers, but you need to charge the double ticket, accommodation, food and salary.