2 Story/New Mobile Home/Pre Built Homes/Temporary Housing/Flat Pack Container Modular House

Product Details
Customization: Available
After-sales Service: 1 Year
Application: Customize
Still deciding? Get samples of US$ 999/Set
Order Sample
Shipping & Policy
Shipping Cost: Contact the supplier about freight and estimated delivery time.
Payment Methods:
visa mastercard discover JCB diners club american express T/T
PIX SPEI OXXO PSE OZOW
  Support payments in USD
Secure payments: Every payment you make at Made-in-china.com is protected by the platform.
Refund policy: Claim a refund if your order doesn't ship, is missing, or arrives with product issues.
Manufacturer/Factory & Trading Company

360° Virtual Tour

Secured Trading Service
Diamond Member Since 2024

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Importers and Exporters
The supplier has import and export rights
High Repeat Buyers Choice
More than 50% of buyers repeatedly choose the supplier
to see all verified strength labels (18)
  • 2 Story/New Mobile Home/Pre Built Homes/Temporary Housing/Flat Pack Container Modular House
  • 2 Story/New Mobile Home/Pre Built Homes/Temporary Housing/Flat Pack Container Modular House
  • 2 Story/New Mobile Home/Pre Built Homes/Temporary Housing/Flat Pack Container Modular House
  • 2 Story/New Mobile Home/Pre Built Homes/Temporary Housing/Flat Pack Container Modular House
  • 2 Story/New Mobile Home/Pre Built Homes/Temporary Housing/Flat Pack Container Modular House
  • 2 Story/New Mobile Home/Pre Built Homes/Temporary Housing/Flat Pack Container Modular House
Find Similar Products
  • Overview
  • Product Description
  • Advantage
  • Service support
  • Case Show
  • Company Profile
  • FAQ
Overview

Basic Info.

Model NO.
Flat pack container house
Feature
Earthquake Resistant, Easily Movable, Eco-Friendliness, Flexibly Combinable, Leak Proof, Moisture Proof, Safe, Thermal Insulation, Waterproof, Wind Resistance
Material
Steel Structure
Certification
CE, ISO
Color
Customized
Life Span
10-20years
Structure
Galvanized Steel Frame
Designs and Drawings
Customized
Temperature Resistant
-40ºC-50ºC
Wind Resistance
Grade 12
Earthquake Resistance
Grade 8
Service
Video Technology, Online and Site Support
Roof Structure
Galvanized Steel Structure
Columns
Galvanized Steel Structure(or Hot Galvanized)
Transport Package
Wooden Frame or Sandwich Panels Protection
Specification
Customize
Trademark
Zone Tang
Origin
China Shandong
HS Code
9406000090

Packaging & Delivery

Package Size
300.00cm * 250.00cm * 200.00cm
Package Gross Weight
1500.000kg

Product Description

Easily Movable 2 Story/New Mobile Home/Pre Built Homes/Temporary Housing/Flat Pack Container Modular House
2 Story/New Mobile Home/Pre Built Homes/Temporary Housing/Flat Pack Container Modular House

Product Description

Flat pack container house is connected to the column and the roof & bottom beam through fastening screws. It can be used as an office, accommodation, restaurant, bathroom, and a combination of large Spaces, which can meet the needs of construction sites, field operation barracks, municipal resettlement housing, and other commercial housing needs. These products adopt the "factory prefabrication + on-site installation" model, and no construction waste is generated at the construction site.After the project is demolished, there will be no construction waste left behind, no damage to the environment, and it can be recycled

Color Multi-color & Customized
Installation As Drawing
Life Span 10-20years
Trademark Zone Tang
Transport Package Wooden Frame or Sandwich Panels Protection and Film Wrapped
Structure Galvanized Steel Frame
Designs and Drawings Customized
Origin Weifang, China
Service Video technology, Online and Site Support
Warranty 1 year
External Size: L5900mm*H2896mm*W2438mm or customized
option size 10ft,20ft,30ft,40ft,etc…
Weight  1.2-1.8t
roof structure galvanized steel structure with 4 corner pieces
1) 0.4/0.5mm Galvanized steel roof covering
2)material insulation(EPS, rock wool ,PU, graphene etc.)
3) galvanized steel plate
base structure

 
galvanized steel structure with 4 corner pieces
1) 1/1.5/1.8/2 mm plastic flooring or floor leather or laminated wood floor or patterned aluminum sheet
2) 15/18/20MM calcium silicate board, fiber cement board or MGO board
3)galvanized steel plate
Columns galvanized steel structure(or hot galvanized)
wall 50/75/100mm sandwich board, standard steel double-sided 0.35mm(sandwich materical is EPS, rock wool ,PU,graphene etc.)  standard sandwich materialis is no less than 80kg/m3
Door Steel security door , Plastic-steel door, Aluminum door, Fireproof door, KFC door or Customized
window Broken bridge aluminum, aluminium alloy frame, Color steel sliding window or Customized
Unit
 
1.the column's internal corner covering
2.Use for fixing the column's internal corner covering
3.undivided rooms' column covering
4.Use for fixing undivided rooms' column covering
5.undivided rooms' roof beam covering
6.Galvanized steel covering
7.Galvanized floor connectors
Electricity Match local standard & other country electrical standards, wire essential; Other electrical supplies are optional and quoted separately ( 1 available distribution box, 2lights, 1switch, 4sockets,1 air conditioning socket or customized)
optional accessories Furniture,electrical appliance for accommodation, kitchen ,bathroom,shower, ceiling,decorative materials,etc.
Application office,toilet,bathroom,changing room,school,classroom,library,shop, meeting room,canteen,guard house,temporary project department of engineering, temporary dormitory for students, temporary makeshift hospital, portable RV, snack street, booth,kiosk, dining car, camp dormitory, camp hotel, playground castle, children's entertainment fortress, recreational villa in tourist area, resort area, earthquake relief materials, post-war reconstruction materials, field office,etc,
Advantage




 
1)fast installation:5hours/set/person,save labor cost
2)Anti-rust:all materiel can use galvanized steel
3)waterproof: steel ceiling,wall,floor
4)fireproof:Fire rating A grade
Service support

 
1)Make design for clients
2)Provide pictures and production schedule for clients every 3 days
3)provide packing list and installation instruction for clients before shipping
4)Can sent installation engineer to clients site for installation instruction
Price terms FOB, CIF ,CFR
Port Qingdao or Tianjin
Delivery time According to the quantity and type of products, we will delivery within 3 days to 1 month after receipt of payment.

Advantage

Safety and comfort:The materials used in the packing room meet the relevant national requirements, high safety performance, large living space, bright, warm and comfortable inside the box.
Environmental protection and energy saving: zero construction waste during installation, short construction period, saving labor and reducing raw materials.
Easy and quick installation: the box and the box are connected by bolts, simple structure, easy and quick installation.
Customized: It can be customized manufacturing according to customer needs
Wall & roof: water proof, sound-insulating, heat-insulating; Environmental-friendly materials.
Structure: Standard; All the steel structures are galvanized & painted

Service support

1)Make design for clients
2)Provide pictures and production schedule for clients every 3 days
3)provide packing list and installation instruction for clients before shipping
4)Can sent installation engineer to clients site for installation instruction

Case Show

2 Story/New Mobile Home/Pre Built Homes/Temporary Housing/Flat Pack Container Modular House
2 Story/New Mobile Home/Pre Built Homes/Temporary Housing/Flat Pack Container Modular House
2 Story/New Mobile Home/Pre Built Homes/Temporary Housing/Flat Pack Container Modular House
2 Story/New Mobile Home/Pre Built Homes/Temporary Housing/Flat Pack Container Modular House
2 Story/New Mobile Home/Pre Built Homes/Temporary Housing/Flat Pack Container Modular House
2 Story/New Mobile Home/Pre Built Homes/Temporary Housing/Flat Pack Container Modular House

Company Profile

Zone Tang Steel Structure Limited is a specialized enterprise dedicated to the research and development, production, and sales of high-quality steel structures, mobile home and container engineering construction.
Our company is located in Weifang City, known as the kite capital of the world, with convenient transportation due to its ocean shipping. we have 16 years professional experience, and our plant spanning across 10,000 square meters.
Our products including flat pack house, expandable container house, folding container house, modified shipping container house, functional container house, prefab house, mobile house, prefab villa, space capsule house etc...All are made of prefabricated steel structures, and each product can be customized according to customer's needs.
"Quality from Professionalism,Professionalism creates Quality",Zone Tang has always adhered to the five basic principles of " first-class technology, first-class quality, first-class speed, first-class management and first-class service," aiming to provide high-quality projects for domestic and foreign customers while also showcasing Chinese manufacturing power and aesthetics to global friends.

2 Story/New Mobile Home/Pre Built Homes/Temporary Housing/Flat Pack Container Modular House
2 Story/New Mobile Home/Pre Built Homes/Temporary Housing/Flat Pack Container Modular House
2 Story/New Mobile Home/Pre Built Homes/Temporary Housing/Flat Pack Container Modular House
2 Story/New Mobile Home/Pre Built Homes/Temporary Housing/Flat Pack Container Modular House
2 Story/New Mobile Home/Pre Built Homes/Temporary Housing/Flat Pack Container Modular House
2 Story/New Mobile Home/Pre Built Homes/Temporary Housing/Flat Pack Container Modular House

FAQ

1: Are you the factory or the trading company?
A: We are Manufacturer/Factory & Trading Company. Please visit us, and we can give you the affordable price.

2: What's your MOQ?
A:Our MOQ is 1 set. Any small trial order is also welcomed and can be in a further discussion.

3: How Long does it take to build a light steel prefab house?
A: It depends on the size of the house. Generally, one 50 square meter house five workers 1-3 days finished installation, save manpower and time

4. Q: How about your date of manufacture?
A:Generally according to the different products, the production date is different.
5.How can we make sure about the product quality after we put the order?
A: Before delivery, we will send you the pictures and videos for you to check the quality, and also you can arrange for quality checking by yourself or by your contacts in the third party inspection organization.

6: How many days needed to install the house?
    For prefab camp house: 6 experienced workers 100sqm per day.

    For 20ft flat pack container house: 4 workers 4 units per day.
    For 20ft cost-effective container house: 4-6 workers 1 unit per day.
    For single storey prefab villa(100m): 4-6 workers finished all installing in 1-2 week.
    For light steel structure villa: 6-8 workers finished about 40sqm within 8-10 days
   Above that it is conventional advice, Final result will base on the efficiency of local staff.
7: What certificate do you have?
A: We have been awarded the certificate by CE, American building Code, ISO9001, ISO14001.

8: What kind of technical drawings could you provide?
A: We could provide three-view drawing, 3D picture, blueprint, foundation, plumbing, electrical, communication, fire alarm, installation, furniture and so on.

9: What is the lifespan and warranty period?
A: The lifespan for Prefab house is 5 to 10year, Container house is 10-15years, Steel structure is 15-20years and Villa is 20-50years. The warranty period for all the house is 12months from the delivery.

10: What the value added service do you have?
A: We have camp/community planning design, indoor and outdoor electrical/plumbing design, communication/fire alarm/security system supply, furniture/ electric appliance offer, etc.

11: How Is your after-sales service?
   1. Any question, welcome to contact us. 24 hours available for you.

   2. One order, one special person to follow the whole process.
   3. For the house installation, we will give you the installation drawing and installation manual. If you need, we also can send you an engineer to teach your workers, but you need to charge the double ticket, accommodation, food and salary.

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier